Register
View of the Shah Jahan Mosque and its spectacular dome. (photo: Belzona International)
View of the Shah Jahan Mosque and its spectacular dome.
27.03.2017, 16:52

Case-study: Dome and Dusted

White Papers & Briefings


The original Green Dome sat atop the tomb of the Islamic Prophet, Muhammad.
The original Green Dome sat atop the tomb of the Islamic Prophet, Muhammad. © Belzona International
The upkeep of buildings of significance and high regard is often a rewarding and interesting opportunity for Belzona. This was particularly true of the application presented by the Shah Jahan Mosque in Woking.


Built in 1889 by Dr Gottleib Leitner, the mosque was the first to be established in Western Europe, outside of Muslim Spain and has stood for a staggering 127 years. Possessing such historical and religious associations, this building warranted special efforts to preserve its condition. Therefore, today the mosque has the honour of being listed as a building of special interest under the National Heritage, attaining historical Grade II status. Meanwhile, registering as an independent charity means that, since 1995, the local community has continually invested in renovation and restoration of the mosque’s original elegance.

 


The Problem

Most definitely, the jewel in the crown of this prestigious building is its green dome. Included as a homage to the green-coloured dome at the Prophet’s Mosque in Medina, the striking design has become an integral part of Shah Jahan Mosque’s heritage. However, over the course of its impressive lifetime, the zinc dome had become significantly damaged and was showing signs of ageing. It was suffering from a large number of perforations around its circumference, as well as several large holes, due to weathering and corrosion of the metal. In addition, the design comprised of a lateral band formed by 41 zinc stars, which had similarly succumbed to corrosion and loss of shape. All of this damage had led to rainwater leaking into the mosque, causing unwanted disruption to the prayer times and community events taking place.

 

In search of a solution, the mosque made several enquiries with companies who utilised traditional hot work repair methods, all of whom rejected the application in fear of aggravating the problems even further. Due to the thin- and through-wall defects in the already fragile zinc dome, it was believed to be impossible to weld repairs without causing additional damage. As a result, a cold-applied alternative was recommended to both rebuild the existing metalwork, as well as provide a waterproof coating for future protection.

 


Application

Prior to proposing a final application, Belzona carried out a series of pull-off tests on the dome’s current coating to assess its adhesion strength. Once the adhesion levels were determined, it was understood that the existing coating could be sufficiently removed using hand tools, creating a clean and rough surface profile, rid of deteriorated coating and corrosion. The dome, measuring a total of 6.5m in diameter, was examined thoroughly to identify and repair any thin- and through-wall defects. Starting with the most severely damaged areas, the application to rebuild and resurface the dome’s profile was carried out using Belzona 1121 (Super XL-Metal). Incorporated with a fine steel mesh over the large perforations in the zinc structure, the metal repair composite was cold-applied without the need for specialist tools.

Final result: seamless, waterproof protection of the historic zinc dome.
Final result: seamless, waterproof protection of the historic zinc dome. © Belzona International
  

Following some additional sanding, Belzona had restored a firm surface onto which the waterproof membrane could be laid. Once more, the substrate was cleaned and prepared in line with Belzona protocol, before the conditioner was applied across the entire dome and the seamless system of Belzona 3111 (Flexible Membrane) was installed. On such a complex surface, the liquid-applied, waterproof and weatherproof membrane demonstrated its ability to easily conform to the various contours of the dome, providing the mosque with long-term roof protection. In particular, this added strength and flexibility to the fragile zinc roof, offering respite from the 127 years of continuous exposure.

 

Altogether, two applicators took a total of three days to complete the repairs and protection of the mosque roof. In order to fully restore the dome to its original splendour, the Belzona membrane was painted green with a compatible coating system. Left uncoated, the stars and crescent moon were subsequently gilded by the client in line with the dome’s original design.


Very content with the repairs, the Specialist Works Manager commented on behalf of the Shah Jahan Mosque, saying: “The works carried out look incredible. Thank you from both myself and our client at the Mosque.”



article Rating

vote data

 (photo: Chubb Systems Limited)
Chubb Systems Limited  - 20.03.2017, 13:54

Securing Early English Written Law

Chubb Fire & Security Limited has installed a security intruder alarm system designed specifically for sensitive environments into Rochester Cathedral to secure some of the UK’s oldest and most...

The Jeddah Tower. (photo: )
dmg events  - 07.03.2017, 01:30

KSA Mega-projects Topping Out at US$ 92 Billion

The scale and cost of numerous on-going projects in the Kingdom of Saudi Arabia (KSA), are attracting renewed interest from global real estate and construction professionals.

 (photo: Awqaf & Minor Affairs Foundation (AMAF))
News Editor  - 09.01.2013, 19:17

"Eco-Friendly" Mosque for Dubai

Awqaf & Minor Affairs Foundation (AMAF) awards AED 25 Million tender to Al Arif Contracting and announces 2014 completion date.

 (photo: Confida FM)
Confida FM  - 02.06.2017, 17:12

New Beginnings for Ayrshire FM Business

The launch of Confida FM promises a bright new future for a wife and husband management team - and the facilities management industry in Scotland...and beyond.

 (photo: WPS Parking Systems BV)
WPS Parking Systems BV  - 15.03.2017, 14:04

Next-generation Parking Technology for Celtic Manor

WPS, one of the UK’s leading parking equipment manufacturers, has won a second contract to provide its ParkAdvance™ technology at the prestigious Celtic Manor Resort in Newport.

 (photo: Infomill Ltd)
Infomill Ltd  - 09.01.2017, 12:22

New Version of PartsArena Pro App

Heating engineers across the UK will enjoy a new, updated version of PartsArena Pro from January 2017 as creator, Infomill rolls out its latest improvements to the leading source of heating parts...

Crocus on site. (photo: Bodet Ltd.)
Bodet Ltd  - 22.09.2016, 20:30

Nursery and Garden Produce Staff Go Biometric

Leading nursery and online garden produce retailer Crocus have just installed the very latest Bodet interactive time and attendance system, to provide accurate and reliable staff attendance data...